WattsOff NOW

WattsOff NOW seamlessly integrates into your existing infrastructure, installed after a distribution board in just 1-2 hours. Target non-essential circuits to conserve energy efficiently while keeping always-on circuits untouched.

Per system: Up to 16 monitored circuits, 6 controlled circuits

How It Works

Power In
Distribution Board

Always-on Circuits

🖥️ Servers ON
❄️ Refrigeration ON
🔒 Security Systems ON
Always On
00:00
WattsOff
After Hours

Non-essential Circuits

💻 Office Equipment OFF
🛠️ Air Compressors OFF
🌡️ Heating OFF
Scheduled

Outside schedule: Scheduled circuits off

Example schedule - you define what's essential and when to power down

Controlling non-essential circuits

By targeting non-essential circuits, the smart-unit ensures energy is conserved efficiently. This fail-safe mechanism guarantees that only necessary power is supplied, significantly lowering overall energy costs.

Essential circuits

Critical systems like servers, fridges, and security systems. These are always on and never automated.

Non-essential circuits

Office equipment, air compressors, and heating. These can be scheduled for savings to reduce waste.

You're always in control. Override any automation with a single tap, or pause the entire system whenever you need.

Why WattsOff NOW?

Purpose-built for non-domestic energy management

Retrofit solution

Seamlessly integrates into existing infrastructure, installed after a distribution board in just 1-2 hours.

Essential vs non-essential

You define which circuits stay always on. Those circuits are never automated.

No extensive rewiring

Easy implementation without disrupting your existing electrical setup.

Fail-safe mechanism

Guarantees only necessary power is supplied, significantly lowering energy costs.

WattsOff NOW pricing

Monitor and control with a single monthly subscription

WattsOff NOW
£20 /system/month ex VAT

36-month minimum

or £25/system/month on a 24-month minimum

  • Up to 16 monitored circuits and 6 controlled circuits
  • Scheduled control, manual override, and ESG reporting

£500 payment – credited to your first subscription invoice. Contact us if you want a funded program.

Early Release journey

A simple four-step path to deployment: secure your place, complete a site survey, confirm savings and timetable, then install your device.

1

Secure your place

Make the £500 payment to join the Early Release Program. Credited to your subscription invoice.

2

Site survey

We review site suitability and, if appropriate, send an engineer to site to confirm scope.

3

Estimate savings

We estimate savings and confirm the timetable before any installation work begins.

4

Device installation

A certified electrician installs your device, typically in 1-2 hours per unit.

Be among the first

WattsOff NOW is available through our Early Release Program. Apply today to get priority access.

Join Early Release